Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 38 years, born on 10 January 1987
Grozny, willing to relocate, prepared for business trips
Chief engineer
Specializations:
- Other
Employment: full time
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 15 years 9 months
April 2018 — currently
7 years 1 month
The Local Hotels and Retails Grozny, Russian Federation
Chief Engineer
Reports to Property General Manager, related to engineering operations.
Afford a high level of property maintenance knowledge.
Have overall responsibility for maintaining the buildings, grounds and physical plant with particular attention towards safety, security and asset protection.
Accountable for managing the budget, capital expenditure projects, preventative maintenance, and energy conservation.
Develops and implements strategies that will deliver products and services, which meet or exceed the needs and expectations of guests and associates while maximizing the financial performance.
Responsible for maintaining standards and local authority requirements. Lead the emergency response team for all facility issues.
September 2017 — March 2018
7 months
JA Hotels and Resorts Dubai, UAE
Assistant Chief Engineer
• Assistant HOD of 5 Star Hotel JA Hotels and Resorts 342 rooms, 7 F&B outlets, 3 meetings rooms.
• Leading the team of 18 no’s subordinate including Shift Engineers and Technicians.
• Achieved 5 Star category of a hotel from DTCM by Key achievement refurbishment project of a guest room, F&B outlets, and other areas.
• Enhance the guest experience by implementing strategic ppm programme.
• Whole responsible for engineering operation in absence of Chief engineer.
• Increase the team building by coaching, motivating team members.
October 2016 — September 2017
1 year
Viceroy Palm Jumeirah Dubai, UAE
Assistant Engineering Manager
• Successfully Pre-Opening of 5 Star luxury Hotel at Palm Jumeirah with 468 Guest rooms and 221 residential apartments and 12 F&B outlets, Banquet facilities up to 600 guests.
• A Part of Pre-opening of team complete Snagging, follow-ups, rectification of engineering plants rooms, guest rooms, F&B outlets, banquets, meeting rooms as per Viceroy Standard Operating Procedure.
• Develop and Implement Viceroy Engineering Operational Standard Operating Procedures.
• Participate Testing and commissioning of Electrical, Mechanical, FLS, MEP system, successfully complete Fire Cause and affects test and Blackout test according to local and federal law of Dubai Government.
• Successfully complete rectification of all major breakdown along with project team and take over the hotel with zero defects.
• Complete the successful inspection and audit by DTCM, DCD, HACCP, DM. While complete all occurred snagging and rectification.
• Successfully Implemented (PPM) Preventive Maintenance Program for guest rooms and plant rooms and achieved Guest satisfaction.
• Review and effectively negotiated 5 % cost of AMC, Vendors, Contractors. While ensuring continuation and enhancement of services.
• Accountable for daily engineering operation like duty roster, SOP checklist, Inspection of plant and machinery, guest rooms, guest comments reviews and immediate action on it.
• Implemented Energy conservation techniques and reduce HLP cost 8% as compared to the Pre-opening stage of the hotel.
November 2014 — October 2016
2 years
HYATT Hotels Corporation
Assistant Engineering Manager
• Successfully Pre-Opening of 275 guest rooms and 5 F&B outlets, Banquet facilities up to 400 guests.
• A Part of Pre-opening of team complete Snagging, follow-ups, rectification of engineering plants rooms, guest rooms, F&B outlets, banquets, meeting rooms as per Hyatt Standard Operating Procedure.
• Develop and Implement Hyatt Engineering Standard Operating Procedures.
• Participate Testing and commissioning of Electrical, Mechanical, FLS, MEP system.
• Successfully complete rectification of all major breakdown along with project team and take over the hotel with zero defects.
• Achieved guest satisfaction score 4.5 on trip advisor by Successfully Implemented (PPM) Preventive Maintenance Program of guest rooms and plant rooms.
• Cross check and ensure the efficiently work done by Contractors during their service. And get the work done as per standard specifications of equipment’s and machines.
• Complete the 5 nos of training under the Training manager and engineering manager and become successful department trainer to train others subordinates.
• Accountable for daily engineering operation like duty roster, SOP checklist, Inspection of plant and machinery, guest rooms, guest comments reviews and immediate action on it.
• Implemented Energy conservation techniques and reduce HLP cost by 5% from the pre-opening.
July 2010 — July 2011
1 year 1 month
Eureka Forbes Limited
Service Manager
• Consumer good product customer service support management.
• Complaints Management, Spares management, warehouse management.
• Recruitments and field training is provided to a technician for the domestic water purifier.
• Organize the service camp and satisfied to the customer satisfaction, and retention of a customer.
July 2009 — July 2010
1 year 1 month
Country Inn and Suites by Radisson Hotels Group
Engineering Supervisor
• Supervise the all technician and support in critical technical issue and guide them.
• Monitor the daily operation of chiller, boiler, WTP plant and engineering logbooks.
• Be familiar with and comply with all relevant engineering department Policies process and procedure.
June 2008 — June 2009
1 year 1 month
The Lemon Tree Hotels
Electrical Technician
• Pre-opening of 100 room hotel
• Repair and maintenance of guest room product, guest room PPM.
• Repair and maintenance of lighting and fixtures, UPS, Inverters.
• Cleaning and dusting of electrical panels and plant room, DG set.
• Cleaning of AHU filters, strainers, servicing of mechanical valves, WTP operation.
• Repair and Maintenance of Electrical DB box cable termination, motor testing, control wiring of DOL, Star-Delta starters.
March 2005 — March 2007
2 years 1 month
66 KV Sub-Station by GETCO Limited
Trainee Electrical Engineer
• Learn and observe the practical operation of Transformer, Vacuum circuit
• Breakers, SF six circuit breakers, Current transformer, Potential Transformer.
• Maintenance of HT/LT panels APFC panel, Battery bank 110 Volt under the guideline of Sr. engineer.
• Connect the CT/PT, Transformer bushings, underground cable laying under the guideline of Sr. engineer.
Skills
Skill proficiency levels
About me
A highly competent engineering professional who can be trusted in managing complex work environments, Increase work force efficiency and overhauling hotel engineering operation, policies and procedures. A multi-skilled, multi-talented and robust self-starter who can beat expectations. As a graduate engineer in electrical with 9 years’ of experience in the field of luxury hotel engineering maintenance and including Pre-opening of three hotels.
Higher education (bachelor)
2014
Bachelor of Engineering in Electrical
Engineering, Degree in Electrical engineering
2011
Diploma in Electrical Engineering
Engineering, Electrical Engineering
2004
Electrical Technical, National Vocational Training
Electrical, High-Voltage Power and Electrical Engineering
Languages
Citizenship, travel time to work
Citizenship: UAE
Permission to work: Russia
Desired travel time to work: Doesn't matter